Namma Family Builder

Construction Specification

Building Dreams, Creating Communities.
Trusted By Families For Delivering Quality Homes And Transparent Real Estate Solutions.

What We Offer

HOUSE CUSTOMIZATION

With the proper selection and in accordance with your needs, we customize your home and flat. We makeover your house to give it a new, modern style.

LOAN ARRANGEMENT

NFBD Construction offers a loan arrangement facility at a low interest to fulfill customer’s needs.

We support having your dream home. 

VASTU COMPLIANCE

One of the main aspects on which we concentrate to analyse the specifics of room placement and improve the aura of your space is vastu compliance.

ON-TIME DELIVERY

For property buyers, NFBD Construction is renowned for its timely delivery. We successfully complete the assignment by utilizing the most recent technology.

GOOD LOCATION

We promise to provide the best transportation for your house in a decent neighbourhood. Location and nearby amenities are top priorities. We build where life flows better.

QUALITY CONSTRUCTION

Our business is renowned for providing exceptional quality building services. In order to create your dream home, we only use premium materials.

How It Works

Request A Quote

  • Submit your construction request through our website or call us directly.
  • Our support team will gather essential details about your requirements.
  • A dedicated executive will be assigned to your project.

Meet Our Experts

  • Our technical expert will visit your site for an in-depth consultation.
  • Discuss your vision, preferences, and budget in detail.
  • Get guidance on design options and project scope.

Book With Us

  • Choose a suitable construction package based on your consultation
  • Confirm the booking by paying a minimal upfront amount.
  • Receive a digital booking confirmation and welcome kit.
Business People PNG
Hand Shake
Real Estate World Image

Receive Detailed Plans

  • Our architects prepare detailed plans and 3D designs for your projec
  • Get floor plans, elevation designs, and structural layouts.
  • Plans are revised until you’re fully satisfied.

Track & Transact

  • Track construction progress in real-time via our mobile app.
  • Get photo updates and daily logs from the site.
  • Make payments safely through milestone-based transactions.

Settle In

  • We conduct a final inspection handover to ensure everything is perfect.
  • Receive warranty documents and post-handover support info.
  • Move into your dream home with complete peace of mind.

Step By Step Process...

DESIGN
Construction Specifications

Architect design as per vastu

FOUNDATION
FOUNDATION

Earthwork excavation for isolated footings and for the plinth beams as per structural drawings.

BASEMENT
BASEMENT

Brickwork in cement mortar 1:5 mix with chamber burnt bricks of 1st sort to a height of 2’6’’ for the flat area from the road level.

STRUCTURE
STRUCTURE

Rcc structure with 9’’ brick external walls and 41/2’’ brick partition wall.

ELECTRICAL
ELECTRICAL

Three phase electrical wiring concealed switches all as per necessary requirements to be supplied including proper earthing and inverter lines also provided.

KITCHEN
KITCHEN

20 mm black granite counter with stainless steel sink with drain board will be provided.

LOFTS
LOFTS

2’ wide, along any one side of the bedrooms and kitchen.

PLUMBING
PLUMBING

Concealed cpvc pipe line in bathroom, pvc pipes for rain water, sanitary waste.

JOINERIES
JOINERIES

Main door frame and shutter with teak wood & varnish finish.Other doors padak wood frame size of 4’’x21/2’’ all windows with padak wood frame, size of 4’’x21/2’’ and shutters with padak wood, size of 3’’x11/2’’ with 4mm pinned glass.Full putty finish with 2 coats of enamel paint over one coat of primer.

WARDROBE
WARDROBE

Wardrobe of one number with 4’ width, 1’9’’ depth and 3 shelves with cuddapah slabs.

PLASTERING
PLASTERING

Ceiling, inner & outer walls plastering in cement with neat finish.

FLOORING
FLOORING

Rooms: vitrified tiles of size 2’x2’ over the entire area (except toilets)

Toilets: ceramic antiskid tiles of size 12’’x12’’ for the toilet flooring.

PAINTING
PAINTING

Inside walls and ceiling with cement based putty finish with two coats of interior emulsion over one coat of primer. Outside walls two coats of exterior emulsion one coat of white cement.

TERRACE
TERRACE

Parapet wall : brick work of 4.5 thick with cement mortar 1:4 mix to a height of 3’6’’ with 9’’ thick brick pillars at every 9’ interval

Frequently Asked Questions

Foundation In R.C.C Details

Column Pit Size – 5’0’’ x 5’0’’ x 5’0’

Column Footings P.C.C – 5’0″ x 5’0″ x 3″

Column R.C Footings – 4’ x 4’ x 1’ 6”

Column Size – 0’9” x 0’9” or 1’0’’ x 0’9’’

R.C.C Details

Plinth Beam – 1’0’’ x 0’9’’ (6 Nos @ 12mm)

Column – 1’0’’ x 0’9’’ (4 Nos @ 16mm & 2 Nos 12 mm))

Roof Level Beam – 0’6” x 0’9’’ with Slab Thickness (4Nos @ 10mm)

Roof Slab – 5” thick ( shorter span – 10mm & longer span – 8mm)

Lintel Beam – Cut lintel & sunshade (Lintel 8mm ring 10 mm rod @ 4 Nos)

Plastering
  •  External Wall Faces – 12mm thick C.M 1:5
  •  Internal Wall Faces – 12mm thick C.M 1:4

All the works will be used in Ultratech, Dalmia, Ramco & Chettinad Cement and M-sand

Doors and Necessary Fittings

Main Door 3’6” x 7’0” – 1st Teak Wood with safety grill

 All the Door 3’0” x 7’0” – Flush Door or Skin Door.

Floor Tiles (Anuj Tiles)

 Kitchen Above the Platforms 4’ glazed Tiles – (Rs.48/- valuable)

 Inner Carpet Flooring Vitrified Tiles – (Rs.48/- valuable)

Bathrooms

Walls  – 7’ glazed Tiles (Rs 30/- valuable)

 Floors  – Antiskid Tiles (Rs 30/- valuable)

Bathrooms Plumbing Work - For One Bathroom

1 Nos – Indian or western water closets

1 Nos – Showers

1 Nos – Tap

1 Nos – Washbasins Sanitary Fittings will be used (All Materials are Parry ware)

Type Of Building

Structure – RCC Framed structure (ARS Steel used in TMT bars only) 

Height of Roof -10’ including RCC slab

STAIR WORK

Staircase – 2000/- per Sq.Ft. (Including tiles and MS steel handle)

Brick Work

External Wall – 9” thick C.M 1: 6

 Internal Wall – 4 ½” thick C.M 1: 4

 Parapet Wall – 4 ½” thick C.M 1:4,3′ Height From Roof

 Basement Height – 3’ Height from Existing Ground Level

Painting - Asian

External Wall – 1 Coat white cement White Wash (Suriya Plus), 2 coat Colour Wash (ACE MATT)

 Internal Wall – 2 Coat wall putty and 1 coat primer, 2 Coat colour wash (TRACTOR EMULSION)

The White / Colour Wash Material Should be used as Above Mentioned

Windows

All the Windows – Wood windows or aluminium siding with glass and fittings of M.S Grills

Kitchen

2” Thick R.C slab Covered with Black Granite – Rs.120/- Sq.Ft.

 Stainless Steel Sink – Rs.3000/-

Electrical Work

Included wiring and switch fixing (Orbit or Norwood) cables are used in (Orbit or Norwood) computer switch,   Inverter point, Telephone point, A/c point, Tv cable line.

 
Extra Work

Bore Well – Depends Upon Depth Of Bore

Compound Wall – Rs.1700/- Per Sq.Ft (5 ft) Rs 2100/- per R.Ft. (7 ft) Rs. 2400/- per R.Ft. (8 ft) 

Septic Tank Above 10000 Ltr – Rs 20/- per Ltr

Water Sump – Rs 25/- per LTR

Water Tiles Sump – Rs.32 /- per LTR

Weathering Course – Rs.150/- per Sq.Ft.

Overhead Tank – Rs.22/- per LTR

Syntax Tank  – Rs.12500/-

Above the Normal Height of Basement – Rs.1000/- Per Sq.Ft

Elevation Work – Depends Upon Design

Year 2019
(Completed)
Year 2019 House Completed Project
Year 2019 (Completed Project)
Year 2020
(Completed)
Year 2020 House Completed Project
Year 2020 (Completed Project)
Year 2021
(Completed)
Year 2021 House Completed Project
Year 2021 (Completed Project)
Year 2021
(Completed)
Year 2021 House Completed Project
Year 2021 (Completed Project)
Year 2022
(Completed)
Year 2022 House Completed Project
Year 2022 (Completed Project)
Year 2022
(Completed)
Year 2022 House Completed Project
Year 2022 (Completed Project)
Year 2023
(Completed)
Year 2023 House Completed Project
Year 2023 (Completed Project)
Year 2023
(Completed)
Year 2023 House Completed Project
Year 2023 (Completed Project)
Year 2024
(Completed)
Year 2024 House Completed Project
Year 2024 (Completed Project)
Year 2024
(Completed)
Year 2024 House Completed Project
Year 2024 (Completed Project)

CONSTRUCTION COST

Steel Details

FE500 | ARUN | PONSURIYA | AGNI

Construction Timeline

Ground Floor – 3 months | G+1 – 4 months Completion guaranteed within 6 months from project start.

Organization

Drainage Pipes

Royal 6 kg pipes for long-lasting durability.

Free Add-ons

3D Floor Plan |
3D Video Walkthrough |
Virtual Tour

Payment Details

Advance Payment

20%

Completion of Basement

15%

Completion of Plinth Beam

10%

Completion of Brick Work

10%

Completion of Roof Work

15%

Completion of Plastering

10%

Completion of Flooring

10%

Completion of Painting

10%